- Required Greenway Dedication
Subject to the limitations of Sec. 8.6.1.C. below, whenever a tract of land included within any proposed residential subdivision or any tier three site plan includes any part of a greenway designated on the Comprehensive Plan, the greenway shall be platted and dedicated as a greenway easement. A written deed of easement shall be recorded in connection with the required plat. - Greenway Easement Width
Subject to the limitations of Sec. 8.6.1.C. below, the greenway easement required to be platted shall at a minimum, be the product of the following dimensions:Minimum standard width multiplied by the length of the boundary along the banks of the adjoining watercourse;
Minimum standard width along the Neuse River corridor: 150 feet from each bank.
Minimum standard width along the Crabtree & Walnut Creek corridors: 100 feet from each bank.
Minimum standard width along Open Space Corridors containing an Existing Trail or a "Proposed Trail" as designated in the Comprehensive Plan’s Greenway Trails Map: 75 feet from each bank.
Minimum standard width along all other designated greenway corridors as established by the Comprehensive Plan’s Open Space Corridors Map: 50 feet from each bank.
- Plus that portion of the watercourse contained within the development when property lines extend to the centerline of the watercourse or wholly incorporate the watercourse
- If a proposed development includes any part of a "proposed trail" as designated in the Comprehensive Plan’s Greenway Trails Map the width of the total easement to be dedicated may be reduced to 30 feet in cases where the developer is constructing a Developed Greenway Trail to City of Raleigh standards .
- Limitation on Dedication
- No dedication shall be required for greenway lying outside of any special flood hazard area, but such area shall be reserved in accordance with Sec. 8.1.6. for possible City acquisition.
- The amount of greenway required to be dedicated shall not exceed the total obligation of the development to pay an open space facility fee, as determined by Article 8.9. Facility Fees, the number and type of dwelling units allowed by law for the development and the schedule of greenway land values listed in the City of Raleigh Fee Schedule, kept on file by the City and is updated and adopted by the City Council.
- Method and Conditions of Reimbursement
- The City Council may, in its discretion, change the general term of payment for individual projects and authorize payment in 1 sum immediately or in fixed payments.
- No payment will be allowed if the dedicated greenway area is being used to satisfy a requirement for open space based on the underlying zoning district. Reimbursements will be reduced by any open space facility fee credits.
- The dedicators shall waive their statutory right to withdraw the dedication prior to receiving any payment.
- Reimbursements shall be fixed at the rate in effect when the dedication occurs.
Sec. 8.6.1. Greenways
TC Number
TC-3-25
Ordinance Number
816 TC 493