Skip to main content
Home
Raleigh UDO

Main navigation

  • Table of Contents
  • Recent Updates
  • History Table

Breadcrumb

  1. Home
  2. CHAPTER 11. BUILDING AND HOUSING CODE
  3. Article 11.7. Manufactured Homes

Sec. 11.7.1. Inspection of Manufactured Homes Certificate Required

  1. All manufactured homes manufactured after September 1, 1971, shall bear permanently attached thereto a label attesting to compliance with the provisions of G.S. 143-149.
  2. The Development Services Department shall inspect each manufactured home to determine whether the manufactured home complies with this section. Such inspection shall be as follows:
    1. Manufactured Home
      The inspector shall inspect each manufactured home for physical damage and determine that conditions of health and sanitation are met. Each manufactured home shall comply with Title 11, Chapter 8, §.0900, et seq. of the North Carolina Administrative Code.
    2. Electrical
      Upon receipt of a certificate signed by a licensed electrician representing a licensed electrical contractor, certifying that the electrical system is properly grounded and free of short circuits, the inspector shall verify that the matters stated in the certificate are true.
    3. Plumbing
      The inspector shall inspect the plumbing of each manufactured home to assure that the plumbing is in a satisfactory working condition. As permitted by visual inspection, without the removal of walls, flooring, ceiling, or roofing, the inspector shall be satisfied that all plumbing fixtures are trapped and vented.
  3. The certificate required by subsection B.2., above shall contain the license number of the electrical contractor and shall be deemed to be in compliance with said requirement if said certificate, upon identifying the manufactured home, contains language substantially as follows:
    "This is to certify that the described unit has been properly grounded and is free of short circuits. The circuitry has been rung out with a meggar and it has been found to ring clear."
  4. All manufactured homes shall be erected or installed in accordance with the
    Set-Up and Installation Standards adopted by the North Carolina Commissioner of Insurance. All manufactured homes shall be connected to the appropriate utilities as approved by the City of Raleigh.

Book traversal links for Sec. 11.7.1. Inspection of Manufactured Homes Certificate Required

  • Article 11.7. Manufactured Homes
  • Sec. 11.7.2. Permit Requirements in Special Flood Hazard Areas
  • Printer-friendly version

UDO Chapters

  • CHAPTER 1. INTRODUCTORY PROVISIONS
  • CHAPTER 2. RESIDENTIAL DISTRICTS
  • CHAPTER 3. MIXED USE DISTRICTS
  • CHAPTER 4. SPECIAL DISTRICTS
  • CHAPTER 5. OVERLAY DISTRICTS
  • CHAPTER 6. USE REGULATIONS
  • CHAPTER 7. GENERAL DEVELOPMENT STANDARDS
  • CHAPTER 8. SUBDIVISION & SITE PLAN STANDARDS
  • CHAPTER 9. NATURAL RESOURCE PROTECTION
  • CHAPTER 10. ADMINISTRATION
  • CHAPTER 11. BUILDING AND HOUSING CODE
  • CHAPTER 12. DEFINITIONS
  • HISTORY TABLE
Was this page helpful?
This feedback widget is not intended for customer service issues.

This feedback is reviewed monthly to help us improve our site. For immediate customer service please contact Planning and Development.

Book navigation

  • Article 11.1. Adoption of Codes by Reference
  • Article 11.2. Development Services Department
  • Article 11.3. Examining Boards & Licensing
  • Article 11.4. Enforcement Provisions
  • Article 11.5. Unsafe Buildings
  • Article 11.6. Housing Code
  • Article 11.7. Manufactured Homes
    • Sec. 11.7.1. Inspection of Manufactured Homes Certificate Required
    • Sec. 11.7.2. Permit Requirements in Special Flood Hazard Areas
  • Article 11.8. Demolition by Neglect of Historic Landmarks and Structures Within Historic Overlay Districts
  • Article 11.9. Nonresidential Building or Structure Code

raleighnc.gov/planning

raleigh logo

raleighnc.gov/planning

Print All

Users should contact the Planning and Development department for subsequent amendments to the UDO or copies of the official version.